AboutRiyadh, Saudi Arabia

AlhussainMajeid Alwayli

Civil Engineer

Civil Engineering graduate with hands-on field training within the Qiddiya Speed Park project environment.

Interlock pavement completed along the parking frontage. Wide interlock pavement with kerb edging, haul road and kerbed bays beyond, warehouse, tent and two-storey building on the skyline
Site record / 4 AugPavement

Experience

June 2026 to October 2026

Civil Engineering COOP Trainee

UNIMAC / Qiddiya Speed Park Project

16 weeks

Field training

3

Case studies

Departmental rotation

Exposure, not roles held

  • Finance
  • Procurement
  • Contracts
  • Tendering
  • Commercial
  • Human Resources
  • Safety / HSE
  • Sales
  • SAP and Purchase Orders
  • Engineering
  • Quality Control
  • Environmental
  • MEP
Full record
Organisation
UNIMAC, United Maintenance & Contracting Company
Project
Qiddiya Speed Park Project
Location
Riyadh, Saudi Arabia
Period
June 2026 to October 2026

Sixteen weeks of cooperative field training within the Qiddiya Speed Park construction environment: an orientation across company departments, then site work on parking packages and external infrastructure, moving from observation toward field supervision and crew coordination.

Tandem roller compacting the first asphalt layer. HAMM tandem roller compacting a wide fresh asphalt mat, paver and distant workers at the far end under new streetlights
Site record / 6 AugAsphalt

Training journey

Schematic, not to scale

  1. Orientation & Operations

    June 2026

    Company structure and the departments that support construction, from the company departments to the project site.

    • LearnedSource: Weekly report 1, 21 June

      Company orientation: organisational structure, business activities and the cooperative training plan.

    • LearnedSource: Weekly report 1, 21 June

      Visits to Finance, Procurement, Contracts, Tendering, Commercial, HR and Safety; how each supports a project.

    • LearnedSource: Weekly report 1, 22 June

      Introduction to the SAP system and the purpose of purchase orders.

    • ObservedSource: Weekly report 1, 23 June

      The purchasing cycle from material request to supplier selection and PO approval.

    • LearnedSource: Weekly report 1, 24 June

      Commercial and tendering: how project costs are managed and technical and financial proposals prepared.

    • ObservedSource: Weekly report 1, 25 June

      First visit to the project site: met the project managers and site engineers, site organisation and daily operations.

  2. Materials & Environment

    June to July 2026

    Where materials come from and how the site controls quality and environmental impact: asphalt plant, environmental procedures, concrete inspection.

    • ObservedSource: Training summary

      Asphalt plant visit and asphalt production exposure.

    • LearnedSource: Training summary

      Environmental procedures: Environmental Management System (EMS), Construction Environmental Management Plan (CEMP), ISO 14001, environmental monitoring and dust control.

    • ObservedSource: Training summary

      Fresh concrete inspection: temperature measurement, slump testing, sampling and compressive-strength specimens for 7-day and 28-day testing.

    • LearnedSource: Training summary

      PPE, HSE talks, excavation barricading, pedestrian routes and safe material placement.

  3. Site Execution

    July 2026

    Parking 12

    Parking 12: interlock, foundations, landscaping and finishing, working with the crews on site.

    • SupervisedSource: Weekly report 5, 23 July

      Shuttering, CLSM pour, white-sand bedding and interlock preparation across two shifts.

    • SupervisedSource: Weekly report 5, 23 July

      Revised Parking 12 layout with additional traffic and directional signs: participated with the engineering team, supervising sign installation and positioning.

    • MonitoredSource: Training summary

      Foundations, formwork, reinforcement and concrete casting for site elements; landscaping and finishing.

    • CoordinatedSource: Training summary

      Final finishing crew (6 workers, 1 Bobcat, 1 JCB) coordinated before the Parking 12 handover.

  4. Field Supervision

    July to August 2026

    EPU / Parking 7

    Parking 7: survey coordination, contractors and subcontractors, drainage, canopy and lighting foundations, base layers and the first asphalt.

    • SupervisedSource: Weekly report 5, 22 July

      20 canopy foundations supervised to the approved drawings; contractors' excavation, reinforcement and concrete monitored.

    • SupervisedSource: Training summary

      40 canopy foundations: alignment, level and position verified with survey coordination.

    • SupervisedSource: Weekly report 7, 2 August

      Interlock and kerb stone installation supervised; white sand and ABC preparation followed and roller compaction monitored.

    • MonitoredSource: Weekly report 7, 5 August

      Two ABC layers and their compaction monitored, soil testing by the testing laboratory observed and the MC1 application monitored.

    • MonitoredSource: Weekly report 7, 6 August

      First asphalt layer monitored alongside the asphalt engineer with the consultant present; surveying of drainage points and levels followed.

    • MonitoredSource: Weekly report 7, 8 August

      Excavation to the stormwater connection monitored; preparation for connecting the drainage line to the main manhole followed.

  5. Infrastructure

    August 2026

    Qiddiya Speed Park

    Qiddiya Speed Park external works: roads, stormwater drainage, concrete and QA/QC.

    • SupervisedSource: Weekly report 9, 16 August

      Stormwater drainage works supervised and followed up; installation and preparation of drainage channels along the road observed.

    • MonitoredSource: Weekly report 9, 18 August

      Bus access road: cutting and removal of the existing interlock monitored; excavation and preparation works followed.

    • SupervisedSource: Weekly report 9, 19 August

      Speed hump and drainage crossing supervised; fresh concrete inspected and the preparation of test specimens monitored.

    • SupervisedSource: Weekly report 9, 20 August

      Bus access road base preparation supervised after the interlock removal; storm line excavation supervised.

    • MonitoredSource: Weekly report 10, 24 August

      Layout corners, alignment and levels checked; unsecured traffic cones identified and their installation followed up.

    • SupervisedSource: Weekly report 10, 25 August

      Landscaping by the subcontractor supervised after utility checks; kerb stone finishing supervised; interlock base compaction followed.

    • SupervisedSource: Weekly report 10, 26 August

      Landscaping excavation supervised after utility checks; drainage channels and grates inspected; wheel stop alignment and levels checked.

    • MonitoredSource: Weekly report 10, 27 August

      Remaining stormwater drainage sections followed up to closure with concrete.

    • ObservedSource: Training summary

      Attended the project's milestone event for 1 Million Safe Man-Hours Without Lost Time Injury, a project milestone.

  • Supervised: 10
  • Coordinated: 1
  • Monitored: 7
  • Observed: 5
  • Learned: 6

Education

3.81/5

GPA

Bachelor of Civil Engineering

Najran University / 2026

Languages
ArabicNative
EnglishIntermediate / Working Proficiency

Certifications

  • Structural Engineering Course

    ILTC72h
  • Project Management Training

    36h
  • Technical Reports Writing

    Najran University
  • English Language Course

    Wall Street English
  • Mendeley Reference Management Course

    Najran University
  • Ithra Program

    King Abdulaziz Center for World Culture20h

Capabilities

Site Engineering

  • Construction drawing reading
  • Site supervision
  • Site inspection
  • Site coordination
  • Basic quantity takeoff

Civil / Infrastructure

  • Concrete works
  • Infrastructure works
  • Asphalt
  • Pavement works
  • Drainage
  • Interlock
  • Kerb stone works

Quality & HSE

  • Quality control awareness
  • Material inspection
  • HSE awareness
  • Environmental awareness
  • Construction inspection

Software

  • AutoCADbasic
  • Microsoft Excel
  • Microsoft Office
  • Course
    • SAFE
    • ETABS
    • SAP2000
    • Revit

Core Competencies

  • Teamwork
  • Communication
  • Adaptability
  • Problem solving
Full record

Site Engineering

Construction drawing reading
Formwork, foundation positions and revised sign layouts checked against the approved drawings.
Site supervision
Assigned activities supervised under the site team: foundations, CLSM and interlock, drainage, walkway concrete.
Site inspection
Fresh concrete, drainage channels and grates, wheel stops, barricading and traffic cones.
Site coordination
Crews, surveyors, contractors and the landscaping subcontractor; finishing crew before handover.
Basic quantity takeoff
Basic level (owner's brief); no site record.

Civil / Infrastructure

Concrete works
Foundations, kerb support, flush kerb trench (C20), walkways, drainage closures; pouring, levelling and finishing.
Infrastructure works
Parking packages and external works within Qiddiya Speed Park.
Asphalt
MC1 prime coat and the first asphalt layer with the asphalt engineer; asphalt plant, core sampling and inspection exposure.
Pavement works
Aggregate base course in two layers, compaction, CLSM, bedding sand, bus road base preparation.
Drainage
Stormwater pipes, connection to the main manhole, drainage channels, grates and a drainage crossing.
Interlock
CLSM, white sand and interlock sequence; compaction, joint filling, cutting and removal for the bus access road.
Kerb stone works
Kerb installation, raised and flush kerbs, finishing and cleaning, taper for bus turning.

Quality & HSE

Quality control awareness
Soil testing on base layers by the testing laboratory, asphalt inspection with the consultant, concrete specimens.
Material inspection
Fresh concrete inspection, temperature and slump exposure, asphalt temperature, aggregate base course.
HSE awareness
PPE, HSE talks, barricading open excavations, pedestrian routes, safe material placement, traffic cones.
Environmental awareness
EMS, CEMP, ISO 14001, environmental monitoring and dust-control practices (departmental exposure).
Construction inspection
Levels, alignment, wheel stops, kerb edges, pre-handover finish.

Software

AutoCAD
Basic.
SAFE
Structural Engineering Course, 72 hours (ILTC).
ETABS
Structural Engineering Course, 72 hours (ILTC).
SAP2000
Structural Engineering Course, 72 hours (ILTC).
Revit
Structural Engineering Course, 72 hours (ILTC).
Microsoft Excel
Productivity.
Microsoft Office
Productivity.

Core Competencies

Teamwork
Worked alongside the asphalt engineer, surveyors, site engineers and crews.
Communication
Site observations recorded and submitted to the site engineer for corrective action.
Adaptability
Two shifts in one day to support a tight schedule; departmental rotation before site work.
Site coordination
Crew and equipment coordination during finishing; contractor and subcontractor follow-up.
Problem solving
Missed foundation excavation caught from the drawings; unsecured cones; kerb taper for bus turning.

Contact

Alhussain Majeid Alwayli

Civil Engineer. Riyadh, Saudi Arabia.

AlhussainAlwayli@outlook.sa

+966 50 735 4251

linkedin.com/in/alhussain-alwayli

Open to Civil & Site Engineering Opportunities